The full operation of installation of 2 generators and 2 gas turbines starting from the unloading from the ship and ending with the installation to their final place is successfully completed. The price of one unit is 25 million Euros and total value of the full project is 100 million Euros.
 |
|
 |
Loading and unloading of 408 tones gas turbine and 300 tones generator from transportation vehicle at port yard.
 |
|
 |
The transport operation of a 290 tones transformer from Areva Facility to Derince port was carried out successfully.
 |
|